David Fitch Services Ltd

Under Construction | Under Construction | Under Construction | Under Construction | Under Construction | Under Construction | Under Construction
Under Construction | Under Construction | Under Construction | Under Construction | Under Construction | Under Construction | Under Construction

Welcome to David Fitch Services Ltd!

INSTALLATIONS

WE DESIGN AND BUILD STAGE LIGHTING SYSTEMS FOR DRAMA STUDIOS, THATRES AND SCHOL HALLS. OUR AIM IS TO PROVIDE THE BEST FACILITIES AND THE BEST VALUE FOR MONEY EQUIPMENT . WE ALWAYS TRY TO PROVIDE FUTURE PROOFING WITHIN THE DESIGN TO ALLOW FOR ADDITIONAL EQUIPMENT, WETHER HIRED OR PURCHASED TO BE ADDED FOR A PARTICULAR PRODUCTION.

THERE ARE SO MANY VARIABLES WITH AN INSTALLATION THAT WE HAVE MANY PHOTOGRAPHS OF INASTALLATIONS THAT WE CAN NEVER GIVE A DEFINITIVE "THIS IS OUR INSTALLATION" BUT HOPEFULLY THESE PICTURES WILL SHOW AN OVER VIEW OF HOW WE APPROACH A PROJECT.

PLEASE CONTACT DAVID FOR A SITE VISIT TO ADVISE YOU.

LANGDON PARK SCHOOL

 

POWER, DIMMERS AND PATCH PANEL

 

 

 

 

 

 

 

 

 

 

 

 

CABLE TRAY TO THE INTERNALY WIRED BARS, IF YOU CAN'T HIDE IT AT LEAST MAKE IT NEAT!

 

 

 

 

 

 

 

 

 

 

 

THE FINAL PART OF THE INSTALLATION BARS AND LANTERNS. THIS IS A MULTI-PURPOSE HALL FOR ASSEMLIES DANCE AND DRAMA AS WELL AS LECTURES AND PUBLIC MEETINGS .

ST MARTINS IN THE FIELDS SCHOOL

BEFORE, A 1963 INSTALLATION

 

 

AND THEN AFTER A 2005 INSTALLATION SHOWING PART OF IT. THE NET RESULT WAS WITH MORE MODERN FITTINGS SIX TIMES AS MUCH LIGHT HITING THE STAGE FOR THE SAME POWER SUPPLY.

BULLERS WOOD SCHOOL

A NEW DRAMA STUDIO WITH LIGHTING SOUND AND BLACKOUT CURTAINING

DIMMING AND PATCH PANEL ETC

GRID SHOWING LANTERNS AND SOUND (WE DID NOT INSTAL THE PROJECTOR WITH THE WHITE TRUNKING)

FINISHED STUDIO SPACE

BULLERS WOOD SCHOOL DANCE STUDIO

63 AMP 3 PHASE DRIVING 24 CHANNELS OF DIMMING WITH 48 OUTLETS ON THE GRID AND JUST ABOUT A FULL COMPLIMENT OF LANTERNS ALLOWS FOR A WIDE RANGE OF COLOURS AND EFFECTS.

 

 

AFTER WAITING 26 YEARS FOR THE NEW STUDIO, I THINK THE EXPRESSIONS OF THE DANCE TEACHERS, KIRSTY AND ELAINE TAPP SAYS IT ALL!

 

CATOR PARK SCHOOL NEW DRAMA STUDIO

SAME EQUIPMENT BUT A DIFFERENT LAYOUT. THE POWER DISTRIBUTION DICTATED BY SITE CONDITIONS.

 

 

About Us | Site Map | Privacy Policy | Contact Us | ©2006 David Fitch Services Ltd